If process data comes from numerous sources or is not permanently stored in another system, manufacturers can use the database as the warehouse for process data.

However, if process data is already stored in a data warehouse, it need not be stored again in the SPC database. SPC solutions must be able to collect data from an existing warehouse, notifying the manufacturer of any problems or process changes, display charts and statistics for the data. Both methods alert firms to failures and process changes, so prompt corrective action may be taken.

Search for the autumn issue of the magazine, manufacturing journalist TR Cutler notes, “Preventive maintenance techniques are widely used to prevent unplanned downtime manufacturers, collecting and analyzing data equipment conditions. However, it is found that the traditional methods of data collection is often not accurate Key Performance Indicators (KPI) for preventive maintenance. And these are the shortcomings of traditional methods of measurement are needed Fu, R automated productivity metrics such as statistical process control and overall effectiveness of equipment that not only the failure to warn businesses and processes, but actionable, real-time decision support and analysis in order to facilitate rapid remedial action activities. ”

Predictive maintenance must be flexible, so it adapts easily to data collection scenarios such as:

 

If the process data obtained from numerous sources and is not permanently stored in another system, such as the maker of the database storing the data processed.

However, if process data is already stored in a data warehouse, it need not be stored again in the SPC database. SPC solutions must be able to collect data from an existing warehouse, notifying the manufacturer of any problems or process changes, display charts and statistics for the data. Both methods alert firms to failures and process changes, so prompt corrective action may be taken.

Overall Equipment Effectiveness (OEE)

Overall equipment effectiveness (OEE ) measurement, as the name suggests, is aimed at improving the effectiveness of equipment. Since equipment effectiveness affects shop floor employees the most, it is essential for them to be involved in tracking the OEE and also planning and implementing equipment improvements to reduce lost effectiveness.

About TR Cutler, Inc. :

TR Cutler, Inc. (www. trcutlerinc. com) was founded by Thomas R. Cutler a decade ago. Cutler maintains extraordinary relationships with clients, journalists, editors, trendsetters, and key business leaders worldwide and has become a key resource for those writing about the manufacturing sector. Cutler founded the Manufacturing Media Consortium™ in the 1999. This extraordinary group of more than 3500 journalists worldwide is writing about trends, data, case studies, profiles, and features in the manufacturing and industrial sector. Cutler has worked with thousands of media outlets to expand manufacturing media coverage.    Cutler has authored more than 2,500 articles for a wide range of manufacturing periodicals, industrial publications, and business                                     journals including most of the leading monthly trade publications.   TR Cutler, Inc. recently launched a new professional coaching system for manufacturers worldwide named C. E. O. ™ or Continuous Experiential Optimization.

 

TR Cutler, Inc.

www. trcutlerinc. com

Thomas Cutler

trcutler@trcutlerinc. com

888-902-0300

 

 


Article Source:China Sourcing Blog

Popularity: unranked [?]